EN10217-1 steel pipe is a non-alloy welded pipe for pressure service.
EN10217-1 Standard Scope:
This EN10217 standard specifies the technical delivery conditions of non-alloy steel circular cross-section electric welded steel pipes under two test conditions, TR1 and TR2, and at specified room temperature.
Manufacturing process
1. Steelmaking process
The steelmaking process is determined by the manufacturer.
2. Deoxidation process
Fully killed steel should be used.
3. Steel pipe manufacturing and delivery conditions
3.1 All non-destructive tests should be performed by qualified personnel with level 1, 2 or 3.
Qualification assessment should be carried out in accordance with EN10256 or equivalent requirements.
It is recommended that there should be personnel with level 3 meeting the requirements of EN473.
The operating authorization issued by the manufacturer should meet the requirements of the written procedure.
Non-destructive testing should be performed by personnel with level 3 authorized by the manufacturer.
Note: The definitions of levels 1, 2 and 3 can be found in specifications EN473 and EN10256.
For pressure equipment in categories I and IV (97/23-EC Guide), the personnel should be approved by a recognized third party organization.
Steel pipes that do not meet this requirement should be marked with "C2" unless the requirements for marking "C1" are adopted (see 3.3).
3.2 The steel pipe shall be manufactured by the production process specified in Table 1.
Unless Option 1 is specified, the production process shall be selected by the manufacturer.
Option 1: The purchaser shall determine the production plan.
The submerged arc welds of submerged arc welded pipes shall have at least one weld layer inside and outside the pipe.
The strip width of the pipe produced for spiral submerged arc welding shall not be less than 0.8 times the diameter of the steel pipe, or shall not exceed 3 times the diameter of the steel pipe.
The finished steel pipe shall not include welds used to connect cold or hot rolled steel strip lengths, or metal plates used for pre-forming,
except spiral welds.
For spiral welds of submerged arc welded steel pipes, when the delivered steel pipe has welds that partially connect the steel strip lengths, they shall comply with the provisions of the welding procedure in Annex A, and the welds shall be inspected and tested equivalent to spiral welds.
3.3 Welding operations shall be performed by qualified personnel in accordance with the corresponding operating procedures.
For pressure equipment in categories II, I and IV (97/23-EC Guide), the personnel shall be approved by a recognized third party organization. Steel pipes not meeting this requirement shall be marked "C1".
3.4 The welding process for submerged arc welded steel pipes shall comply with the requirements of Annex A.
3.5 EN10217 covers the delivery conditions of pipe fittings. See Table 1
Unless option 2 is specified, the manufacturer shall choose the delivery conditions when inquiring and placing orders.