CZ440 Mechanical Cardan Shaft Pipe
video

CZ440 Mechanical Cardan Shaft Pipe

CZ440 mechanical universal shaft tube is produced and inspected according to YB/T 5209 standard, manufactured by high-frequency electric welding of hot-rolled steel strip, and delivered in heat-treated state.
Send Inquiry
Chat Now
Product Introduction

CZ440 mechanical universal shaft tube is produced and inspected according to YB/T 5209 standard, manufactured by high-frequency electric welding of hot-rolled steel strip, and delivered in heat-treated state.
Steel pipes should be subjected to flattening test. When the nominal wall thickness is not more than 5.0mm, the weld should be located at 90° to the direction of force, and the sample should be pressed to 2/3 of the nominal outer diameter of the steel pipe between the two plates;
When the nominal wall thickness of the steel pipe is greater than 5.0m, the welds of the two samples should be located at 90° and 0° to the direction of force respectively, and the sample should be pressed to 3/4 of the nominal outer diameter of the steel pipe between the two plates. After the test, the sample should not have cracks or splits.
GNEE Group specializes in the production of CZ440 steel pipes. According to the requirements of YB/T 5209 standard, steel pipes are subjected to flattening test, flaring, hydraulic pressure, non-destructive testing and other quality inspections. If you need, you can contact us at any time.

cz440 tube

CZ440 Cardan drive shafts Tube Specification

Ends

Plain end/Beveled,protected by plastic caps on both ends, cut quare,grooved,threaded and coupling,etc.

Surface Treatment

Bare,Painting black,varnished,galvanized,anti-corrosion 3PE PP/EP/FBE coating

Technical Methods

Hot-rolled/Cold-drawn/Hot-expanded

Origin

China

Third Party Inspection

SGS BV MTC

Trade Terms

FOB CIF CFR

Payment Terms

FOB 30%T/T,70% before shipment
CIF 30% pre-payment and the balance to be paid before making shipment
or Irrevocable 100% L/C at sight

MOQ

10 tons

Supply Capacity

5000 T/M

Delivery Time

Usually within 10-45 days after receipt of advance payment

cz440 mechanical cardan shaft pipe

FAQ

Q: Can provide OEM/ODM service?
A: Yes. Please feel free to contact us for more details discuss.
Q: How is your Payment Term?
A:One is 30% deposit by TT before production and 70% balance against copy of B/L; the other is Irrevocable L/C 100% at sight.
Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
Q: Can you provide sample?
A: Yes, for regular sizes sample is free but buyer need to pay freight cost.

Hot Tags: cz440 mechanical cardan shaft pipe, China cz440 mechanical cardan shaft pipe manufacturers, suppliers, BS1387 ERW welded pipe, ASTM A135 GrA GrB ERW Steel Tube, ERW Pipe A178, rectangular pipe, Carbon Steel Tubes, S235JR

Send Inquiry