1. What are proper startup procedures?
Pre-start checks: Water level, valves
Filling/purging: Remove air, proper chemistry
Heating rate: Follow manufacturer curves
Pressure raising: Controlled steps
Load application: Gradual increase
2. How to manage load changes safely?
Ramp rates: Typically 3-5%/minute
Chemistry monitoring: Adjust treatments
Temperature tracking: Avoid thermal shock
Flow assurance: Maintain minimums
Stabilization periods: At intermediate loads
3. What shutdown considerations are critical?
Cooling rates: Mirror startup curves
Layup preparation: Dry vs wet methods
Chemistry control: Final treatment
Inspection opportunities: While accessible
Preservation: Prevent idle corrosion
4. How to optimize sootblowing?
Sequence planning: Maximize effectiveness
Frequency adjustment: Based on fouling
Nozzle maintenance: Ensure proper operation
Parameter optimization: Pressure, duration
Monitoring: Before/after effectiveness
5. What are key operator training topics?
Normal operations: Parameter monitoring
Emergency response: Tube failure actions
Chemistry control: Importance and methods
Equipment limits: Safe operating windows
Troubleshooting: Problem recognition