Q345 Welded Carbon Steel Pipe
Payment Terms: 30% TT in advance, 70% TT /70% LC at sight balance before shipment
Price Terms: FOB, EXW, CIF, CFR
Q345 is a kind of steel, which belongs to low alloy steel (C<0.2%), and is widely used in buildings, bridges, vehicles, ships, pressure vessels, etc. Q represents the yield strength of this material, and the 345 at the end refers to the yield value of this material, which is about 345MPa. And the yield value will decrease with the increase of material thickness. Q345 steel pipe has good comprehensive mechanical properties, acceptable low temperature performance, good plasticity and weldability. It is used for medium and low pressure containers, oil tanks, vehicles, cranes, mining machinery, power stations, bridges and other structures that bear dynamic loads, mechanical parts, building structures, general metal structures, hot rolled or normalized state, and can be used for various structures in cold areas below -40℃.
Q345 Carbon Steel Pipe Specification
|
Surface |
Polishing, annealing, pickling,bright |
|||
|
Standard |
GB, AISI, ASTM, ASME, EN, BS, DIN, JIS |
|||
|
Technique |
Cold Rolled, Hot Rolled |
|||
|
Grade |
304,304L,309S,310S,316,316Ti,317,317L,321,347,347H,304N,316L, 316N,201, |
|||
|
Thickness |
0.4mm-30mm or customized |
|||
|
Out diameter |
6mm-630mm or customized |
|||
|
Length |
2000mm, 3000mm,4000mm, 5800mm, 6000mm,12000mm or as required |
|||
|
Processing Type |
Cutting, bending, welding |
|||
|
Application |
Widely used in petroleum,foodstuff,chemical industry,construction, electric power,nuclear,energy,machinery,biotechnology,paper |
|||
|
Lead Time |
7-15 working days after the receipt of 30% deposit |
|||
|
Payment Terms |
30% TT in advance, 70% TT /70% LC at sight balance before shipment |
|||
|
Price Terms |
FOB, EXW, CIF, CFR |
|||
|
Packing |
Each tube in a plastic bag with size label outside and pack in small bundles |
|||
Q345B LSAW Pipe
FAQ
1. How can I get a quote from you?
You can leave us a message and we will reply every message promptly.
You can also find our contact information on the contact page.
2. Can I get a sample before ordering?
Of course. Usually, our samples are free. We can produce your samples or technical drawings, and you only need to pay the shipping cost. We can make molds and fixtures to customize our products according to your needs.
3. How long is your delivery time?
It mainly depends on your location and demand volume. The delivery time is usually around 2 weeks.
If there is stock, we can ship within 2 days.
4. What are your payment terms?
Our usual payment terms are 30% deposit and the rest against B/L. L/C can also be accepted. Shipping terms include EXW, FOB, CFR, CIF and DDU. As you like.
5. How can you guarantee the quality of my goods?
We are a factory with 100% pre-delivery inspection to guarantee the quality.
Hot Tags: q345 welded carbon steel pipe, China q345 welded carbon steel pipe manufacturers, suppliers, Structural Pipe, High frequency straight seam resistance welded steel pipe, SSAW Steel Pipe, Seamless Mechanical Tubing, ASTM A252 steel pipe, A213 T22 T91 Stainless Steel Welded Pipe
Previous
ASTM A53 Black Steel PipeYou Might Also Like
Send Inquiry















