ASME SA178 Welded Steel Boiler Tubes
video

ASME SA178 Welded Steel Boiler Tubes

Specification: OD(1/2"-60") or Customized
Wt: 1.0-30mm,or according to customer's special request
Length: 1-20meters,or according to customer's special request
Send Inquiry
Chat Now
Product Introduction

A178 boiler tubes are resistance-welded carbon steel tubes and carbon-manganese steel boiler and superheater tubes, whose length is greater than the periphery, and which can be used for pipelines, thermal equipment, mechanical industry, petroleum and geological exploration, containers, chemical industry, and special purposes.

ASTM A178 Boiler Tube Specification

Standard: ASME/ASTM SA/A214 A178 A423 A513 A672 A53 A500,A213,A312,A269,A778,A789,
GB/T3091 GB/T3094;DIN EN10025; DIN EN10217-2005; BS EN10217; BS EN10219; BS EN10025;
JIS G3466
Specification: OD(1/2"-60") or Customized
Wt: 1.0-30mm,or according to customer's special request
Length: 1-20meters,or according to customer's special request
Package: Export Standard Package
Pipe ends: (1)Plain
(2)Beveled
(3)Threaded with coupling and plastic cap
End protector: (1) Plastic cap
(2) Iron protector
(3) as request
Surface Treatment: (1) Bared
(2) Black Painted
(3) Oiled
Application: Construction,machine structure pipe, Agriculture equipment pipe,Water and gas pipe, Greenhouse pipe, Scaffolding pipe, Building material tube, Furniture tube, Low pressure fluid tube, Oil pipe, etc.
Mill MTC: Supplied before shipment
Inspection: The Third Party inspection can be accepted,SGS,BV,TUV
Mount port: Any port in China
Trade Term: FOB,CIF,CFR,EXW,etc.
Price Term: TT or LC at sight

A178 Welded Boiler Tube

A178 carbon boiler tubeA178 Tubing

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FAQ

Q:Can we visit your factory ?

A:Warmly welcome once we have your schedule we will pick you up .

Q: Do you have quality control?

A: Yes, we have gained BV, SGS authentication.

Q: Can you arrange the shipment?

A: Sure, we have permanent freight forwarder who can gain the best price from most ship company and offer professional service.

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 25-45 days if the goods are not in stock, it is according to quantity.

Q:How can we get the offer?

A: Please offer the specification of the product,such as material,size,shape,etc.So we can give the best offer.

Q:Can we get the some samples? Any charges?

A: Yes , we could offer the sample for free charge but do not pay the cost of freight . If you place the order after confirm the sample , we will refund your express freight or deduct it from the order amount.

Hot Tags: asme sa178 welded steel boiler tubes, China asme sa178 welded steel boiler tubes manufacturers, suppliers, seamless carbon steel pipe, ASTM A500 Welded Pipe, A335 ERW Pipe, EN 10219 1 Longitudinally Welded Pipe, BS EN10219 1 Welded Pipe, ASTM A53ERW pipe

Send Inquiry