A500 GRB Cold-formed Welding Pipe
A500 GRB Carbon Steel Square Hollow Section Description
A500 GR.B Cold Formed Welded Tubes are carbon steel structural tubes conforming to the ASTM A500 standard, manufactured through a combination of cold forming processes (e.g., cold rolling or cold bending) and welding techniques for engineering scenarios requiring high dimensional accuracy and mechanical strength. Its core characteristics are as follows:
Manufacturing process
Cold forming technology: Cold rolling/cold bending of steel plate or strip at room temperature to form square, rectangular or round cross-section with high dimensional accuracy and smooth surface.
Welding method: Straight seam resistance welding (ERW) or submerged arc welding (SAW) is used, and the welds are non-destructive testing (e.g. ultrasonic flaw detection) to ensure quality.
Post-treatment: passivation, coating or cold-drawing can be carried out to improve corrosion resistance and mechanical properties
A500 GRB Cold Rolled Carbon Steel Welded Pipe Square Tube Specification
|
Product Name
|
Black or Galvanized Square & Rectangular Tube (SHS&RHS)
|
|||
|
Standard
|
ASTM A500, EN 10219-1, EN10219-2, GB/T6728
|
|||
|
Grade
|
A500 GR.B, S235JR, S275JR, S355JR, Q235B, Q355B
|
|||
|
Size
|
15X15-250X250MM, 20X30-150X200MM, OR CUSTOMIZED SIZE
|
|||
|
Thickness
|
0.8-8MM OR CUSTOMIZED THICKNESS
|
|||
|
Length
|
6M, 12M, 5.8M OR CUSTOMIZED LENGTH
|
|||
|
Surface
|
BLACK, GALVANIZED, ANTI-RUST OIL
|
|||
|
Production Techlonogy
|
Cold formed welded
|
|||
|
MOQ
|
5 tons
|
|||
|
Lead Time
|
7-10 DAYS AFTER RECEIVING THE ADVANCE PAYMENT
|
|||
|
Payment Term
|
30%+70% BY T/T OR LC AT SIGHT
|
|||
|
Delivery Term
|
FOB, CFR, CIF
|
|||
|
Usage
|
Civil engineering, architecture, steel towers, shipyard,
scaffoldings, struts, piles for suppression of landslide and other structures
|
|||
A500 GRB SHS Pipe



FAQ
Q: What are the shipping ports?
A: In general, we ship from Shanghai, Tianjin, Qingdao, Ningbo ports, you can choose other ports according to your needs.
Q: About the product price?
A: Due to the cyclical changes in raw material prices, prices vary from period to period.
Q: What certifications do your products have?
A: We have ISO 9001, SGS, EWC and other certifications.
Q: How long does your delivery time take?
A: Generally, our delivery time is within 7-45 days, if there is a great demand or special circumstances, it may be delayed.
Q: Can I visit your factory?
A: Of course, we welcome customers from all over the world to visit our factory.
Q: Does the product have quality inspection before loading?
A: Of course, all our products have undergone strict quality inspection before packing, and unqualified products will be destroyed.
Q: How to pack the product?
A: The inner layer has a waterproof paper outer layer, iron packaging, and is fixed with a fumigated wooden pallet. It can effectively protect products from corrosion during ocean transportation.
Hot Tags: a500 grb cold-formed welding pipe, China a500 grb cold-formed welding pipe manufacturers, suppliers, alloy steel tubing, Electric Resistance Welded Tube, ASTM A178 pipe, JIS G3466 Structural Pipe, ASTM A334 Gr 1 carbon steel seamless pipe, A691 Capacitor Tubes
You Might Also Like
Send Inquiry













