ASME SA691 EFW Pipe
video

ASME SA691 EFW Pipe

MOQ: 10 Ton
Surface: Annealed, pickled, polished
Shipment time: Within 10-20 workdays after receiving deposit
Send Inquiry
Chat Now
Product Introduction

ASME SA691 welded tubes cover electrofusion-welded carbon and alloy steel tubes with filler metals added, which are made from pressure vessel-quality steel plates of various analyses and strength grades for high-temperature and high-pressure service. Heat treatment may or may not be required to achieve the desired mechanical properties or to meet applicable code requirements. Supplementary requirements are available when additional testing or inspection is required. The specification nominally covers pipe 16 in.[400 mm] in outside diameter and larger with wall thicknesses up to 3 in.[75: mm] inclusive. Pipe having other dimensions may be furnished provided it complies with all other requirements of this specification.

ASME SA691 Carbon and Alloy Steel Pipe Specification

Size

Outer Dia: 21.3mm-660mm,According to customer requirements

Wall Thickness: 0.5mm-20mm,According to customer requirements

Length: 1-12m,According to customer requirements

Outside Coating

black painting, anti-corrosion oil, galvanized or as per required by customer

Standard

ASTM A270-03A, ASTM A312/A312M-06, ASTM A358/A358M-05, ASTM A632-04,etc

Application

Petroleum, Chemical industry, mechanical equipment

Processing Service

Bending, Welding, Decoiling, Punching, Cutting, Moulding

Packing

Standard Seaworthy Package,according to customer requirements

MOQ

10 TON

Surface

Annealed, pickled, polished

Shipment time

Within 10-20 workdays after receiving deposit

A691 Welded Steel Pipe

A691 Alloy Steel PipeA691 Alloy EFW Pipe

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FAQ

Q1:Where is your factory?
A: Our company's machining center is located in Henan, China.

Q2: What is your delivery time?
A: For stock products, we can ship within 7 days after receiving the deposit. For customer orders, the production time is 15-30 working days after receiving the deposit.

Q3: If I accept your quality, can I place a sample order?
A: Yes, we can send samples to you, but you need to pay the courier fee, it takes about 5-7 days for customized samples, our MOQ is 1 ton.

Q4: How do you guarantee the quality of your products?
A:Provide quality inspection report when shipment, we also accept and support third party inspection.

Q5: How can I get the price of the products I need?
A:The best way is that you can send us the material, size and surface so that we can produce it for you and check the quality.

Hot Tags: asme sa691 efw pipe, China asme sa691 efw pipe manufacturers, suppliers, API Electrofusion Welded Carbon Steel Tube, Electrofusion Welding Plastic Pipe, LSAW Pipes, EFW Pipe, Polyethylene Pipe For Water Supply, Alloy Mechanical Tube

Send Inquiry