In October 2022, a Korean client first collaborated with GNEE Group. After receiving the A106 seamless carbon steel pipe samples from GNEE, the client was very satisfied and immediately ordered 300 tons of A106 seamless carbon steel pipes. In May 2023, the client took on a new engineering project and purchased an additional 500 tons of A335 P91 alloy pipes from GNEE Group.


This April, the client expressed a desire to visit GNEE Group and discuss the third collaboration in depth. Upon the client's arrival, we first gave them a tour of the company's facilities and introduced the distribution of various departments. Then, we took the client to the conference room to begin discussions about the third collaboration. The client stated that the steel pipes needed to be customized with higher requirements and must pass more stringent quality inspections. We assured the client that we could meet these requirements, but the delivery time would be longer. The client accepted this but hoped for delivery within 60 days. After confirming the material and specifications of the steel pipes with the client, we assured them that we could deliver the order within 60 days without compromising on quality. The client was very pleased with this arrangement. He ordered 500 Tons A672 CC65 EFW pipes.


Finally, we took a group photo with the client. The client expressed their intention to continue working with GNEE Group.







