S235J2 Carbon Steel Pipe
video

S235J2 Carbon Steel Pipe

Delivery Time: Within 7 Days
Transport Package: Wooden Package or as Requirment.
Production Capacity: 100000 Ton/Tons Per Month
Send Inquiry
Chat Now
Product Introduction

S235J2 carbon steel pipe is a non-alloyed structural welded pipe in accordance with European standard EN10219, delivered in hot rolled condition or normalized condition, which can be used in machinery manufacturing, construction, chemical industry, petroleum industry and so on.

S235J2 ERW steel pipe

S235J2 Welded Tube Specification

material Q195,Q235,Q345,Q275,A36,A53,A106,A192,ST52,Q355,A210,T12,T11,P5,P9,P91,T22,A333,4140,5135 etc.
standard AISI,ASTM,JIS,GB,DIN,EN,SUS,etc
grade 1.7220,1.7336,1.2601,1.7380,1.7335,1.0033,1.0116 etc.
application Widely used in construction, chemical, food, agriculture, ship parts and other industries.
Suitable for train, airplane, conveyer belt, vehicle, bolt, nut, spring, screen, etc.
payment terms 30% TT deposit ,the balance T/T or L/C at sight
Price term Ex-work,FOB,CIF,CFR,etc
delivery time 7-15 days after receving the deposit
packing Export standard package, suit for all kinds of transport, or as required.
Shipment by bulk or load into 20ft / 40ft containers

S235J2 Structural Tube 

FAQ

Q. How do you control the quality?
A. We provide various test certificates such as chemical element test report, impact test report, non-destructive test report and so on with the shipment, and we can also provide third party inspection.

Q: What are the packing terms?
A: Generally, we pack the goods in bundles or rolls with rods or belts, we can also pack the goods according to customers' requirements.

Q: What is your delivery time?
A: For stock goods, we can deliver the goods to the loading port within 3 days after receiving your deposit.
For production period, it usually takes 7-15 days after receiving the deposit.

Q. Can you provide samples?
A: We can provide small samples of our stock for free if you contact us. Of course, you only need to pay the shipping cost.

Q: What are your payment terms?
A: 30% T/T as advance deposit and 70% before delivery. We will show you photos of the product and packaging before you pay the balance.

Hot Tags: s235j2 carbon steel pipe, China s235j2 carbon steel pipe manufacturers, suppliers, steel pipelines, Boiler steel pipes, A500 Grade A B C ERW Tubes, Straight Seam Pipe, spiral submerged arc welded SAWH steel pipe, Electric Fusion Welding Pipe

Send Inquiry